ITAC Assessment: WI0156
ITAC logo
ITAC Assessment: WI0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FRYERS,BREADINGS
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area
n/a
Annual Production 78,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,850 523,740
kWh
Natural Gas $8,091 1,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,451 - $1,382
-
kWh
$69
-
MMBtu
-
02 2.3191: Use demand controller or load shedder $1,308 $10,000 $1,308
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $874 $2 $908
12,896
kWh
- $(-34.0)
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $622 $1 $841
12,016
kWh
$(-219.0)
-
MMBtu
-
05 2.6121: Reduce hot water temperature to the minimum required $184 - $184
2,638
kWh
- -
06 2.1123: Install automatic stack damper $452 $500 - $452
-
MMBtu
-
07 2.6214: Shut off pilots in standby equipment $136 - - $136
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $205 $150 - $205
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $142 $640 $142
2,052
kWh
- -
10 2.3132: Recharge batteries on during off-peak demand periods $106 $150 $106
-
kWh
- -
TOTAL RECOMMENDED $5,480 $11,443 $4,871
29,602
kWh
$643
-
MMBtu
$(-34.0)
TOTAL IMPLEMENTED $4,717 $10,643 $4,765
29,602
kWh
$(-14.0)
-
MMBtu
$(-34.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs