Assessment Year | 1984 |
---|---|
Principal Product | MOLDED PLASTIC COMPONENT |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $224,134 | 5,296,600 |
kWh
|
$0.042 |
Natural Gas | $136,599 | 26,577 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,473 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,740 | $600 | - |
$8,740
-
MMBtu
|
|
02 | 2.2163: Use minimum steam operating pressure | $4,364 | - | - |
$4,364
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,302 | - |
$5,302
176,729
kWh
|
- | |
04 | 2.2514: Cover open tanks | $2,118 | $250 |
$1,152
38,394
kWh
|
$966
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $1,573 | $140 | - |
$1,573
-
MMBtu
|
|
06 | 2.2122: Install / repair insulation on condensate lines | $1,100 | $256 | - |
$1,100
-
MMBtu
|
|
07 | 2.2122: Install / repair insulation on condensate lines | $900 | $114 | - |
$900
-
MMBtu
|
|
08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $190 | $45 | - |
$190
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,287 | $1,405 |
$6,454
215,123
kWh
|
$17,833
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,473 | $254 | - |
$2,473
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs