ITAC Assessment: SF0528
ITAC logo
ITAC Assessment: SF0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Electronics Chemical Manufacturing
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 100
Tgal
Production Hrs. Annual 4,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $772,825 8,209,597
kWh
Electricity Demand $407,779 14,196
kW-mo/yr
Natural Gas $268,265 29,195
MMBtu
TOTAL YEARLY COSTS $1,448,869
RECOMMENDED SAVINGS* $29,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,402 $11,547 $7,335
77,921
kWh
$3,067
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,330 $22,874 $6,666
70,808
kWh
$4,218
-
kW-mo/yr
- $467 $(-21.0)
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,178 $27,403 $8,164
86,724
kWh
$3,413
-
kW-mo/yr
$(-3,399.0)
-
MMBtu
- -
TOTAL RECOMMENDED $29,910 $61,824 $22,165
235,453
kWh
$10,698
-
kW-mo/yr
$(-3,399.0)
-
MMBtu
$467 $(-21.0)
TOTAL IMPLEMENTED $11,330 $22,874 $6,666
70,808
kWh
$4,218
-
kW-mo/yr
- $467 $(-21.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs