Assessment Year | 2012 |
---|---|
Principal Product | Automotive Parts |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | greater than $500 M |
# of Employees | 615 |
Plant Area |
270,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 6,920
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,886,521 | 33,834,464 |
kWh
|
$0.056 |
Electricity Demand | $83,493 | 107,042 |
kW-mo/yr
|
$0.78 |
Electricity Fees | $533,108 | - |
|
- |
Natural Gas | $1,269,099 | 204,693 |
MMBtu
|
$6.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $314,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $279,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $167 | - |
$163
2,906
kWh
|
$4
-
kW-mo/yr
|
- | - | - | |
02 | 2.6211: Conserve energy by efficient use of vending machines | $17 | - |
$17
307
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $13,648 | $1,000 |
$13,648
243,722
kWh
|
- | - | - | - | |
04 | 3.1161: Eliminate/reduce an operation | $24,117 | $15,840 |
$1,194
(-21,320)
kWh
|
$309
-
kW-mo/yr
|
- | $660 | $21,954 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,410 | $2,500 |
$3,410
60,896
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,147 | $1,075 |
$527
9,408
kWh
|
$10
-
kW-mo/yr
|
- | - | $610 | |
07 | 2.2437: Recover waste heat from equipment | $250,480 | $603,880 | - | - |
$250,480
-
MMBtu
|
- | - | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $503 | $1,805 |
$503
8,997
kWh
|
- | - | - | - | |
09 | 2.3212: Optimize plant power factor | $21,253 | $79,288 | - | - | - | - | $21,253 | |
TOTAL RECOMMENDED | $314,742 | $705,388 |
$19,462
304,916
kWh
|
$323
-
kW-mo/yr
|
$250,480
-
MMBtu
|
$660 | $43,817 | ||
TOTAL IMPLEMENTED | $279,154 | $623,295 |
$5,131
48,984
kWh
|
$319
-
kW-mo/yr
|
$250,480
-
MMBtu
|
$660 | $22,564 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs