ITAC Assessment: SU0319
ITAC logo
ITAC Assessment: SU0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Parts
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 615
Plant Area 270,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,920
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,886,521 33,834,464
kWh
Electricity Demand $83,493 107,042
kW-mo/yr
Electricity Fees $533,108 -
Natural Gas $1,269,099 204,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $314,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $279,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4314: Use synthetic lubricant $167 - $163
2,906
kWh
$4
-
kW-mo/yr
- - -
02 2.6211: Conserve energy by efficient use of vending machines $17 - $17
307
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $13,648 $1,000 $13,648
243,722
kWh
- - - -
04 3.1161: Eliminate/reduce an operation $24,117 $15,840 $1,194
(-21,320)
kWh
$309
-
kW-mo/yr
- $660 $21,954
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,410 $2,500 $3,410
60,896
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,147 $1,075 $527
9,408
kWh
$10
-
kW-mo/yr
- - $610
07 2.2437: Recover waste heat from equipment $250,480 $603,880 - - $250,480
-
MMBtu
- -
08 2.6211: Conserve energy by efficient use of vending machines $503 $1,805 $503
8,997
kWh
- - - -
09 2.3212: Optimize plant power factor $21,253 $79,288 - - - - $21,253
TOTAL RECOMMENDED $314,742 $705,388 $19,462
304,916
kWh
$323
-
kW-mo/yr
$250,480
-
MMBtu
$660 $43,817
TOTAL IMPLEMENTED $279,154 $623,295 $5,131
48,984
kWh
$319
-
kW-mo/yr
$250,480
-
MMBtu
$660 $22,564
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs