| Assessment Year | 1992 |
|---|---|
| Principal Product | COMMERCIAL PRINTING |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $385,908 | 5,058,910 |
kWh
|
$0.076 |
| Natural Gas | $53,089 | 18,489 |
MMBtu
|
$2.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7273: Install desiccant humidity control system | $51,435 | $27,000 |
$52,313
696,952
kWh
|
$(-878.0)
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,318 | $10,089 |
$7,826
102,579
kWh
|
- | $(-508.0) | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,493 | - |
$2,493
32,825
kWh
|
- | - | |
| 04 | 2.6232: Install set-back timers | $2,039 | $600 |
$2,039
26,671
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,358 | - |
$8,358
109,613
kWh
|
- | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $1,658 | $5,000 | - |
$1,658
-
MMBtu
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $424 | $500 | - |
$424
-
MMBtu
|
- | |
| 08 | 2.3135: Schedule routine maintenance during non-operating periods | $949 | - |
$1,249
-
kWh
|
- | $(-300.0) | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $436 | $800 |
$436
5,862
kWh
|
- | - | |
| TOTAL RECOMMENDED | $75,110 | $43,989 |
$74,714
974,502
kWh
|
$1,204
-
MMBtu
|
$(-808.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs