ITAC Assessment: WI0150
ITAC logo
ITAC Assessment: WI0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,908 5,058,910
kWh
Natural Gas $53,089 18,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7273: Install desiccant humidity control system $51,435 $27,000 $52,313
696,952
kWh
$(-878.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,318 $10,089 $7,826
102,579
kWh
- $(-508.0)
03 2.7111: Reduce illumination to minimum necessary levels $2,493 - $2,493
32,825
kWh
- -
04 2.6232: Install set-back timers $2,039 $600 $2,039
26,671
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,358 - $8,358
109,613
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $1,658 $5,000 - $1,658
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $424 $500 - $424
-
MMBtu
-
08 2.3135: Schedule routine maintenance during non-operating periods $949 - $1,249
-
kWh
- $(-300.0)
09 2.4221: Install compressor air intakes in coolest locations $436 $800 $436
5,862
kWh
- -
TOTAL RECOMMENDED $75,110 $43,989 $74,714
974,502
kWh
$1,204
-
MMBtu
$(-808.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs