Assessment Year | 1992 |
---|---|
Principal Product | ROAD REFLECTORS/MARKERS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 6,960
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $355,809 | 5,252,638 |
kWh
|
$0.068 |
Natural Gas | $28,342 | 8,215 |
MMBtu
|
$3.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,965 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,637 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,441 | - |
$27,689
408,851
kWh
|
$(-4,248.0)
-
MMBtu
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $2,795 | $5,000 |
$2,795
41,325
kWh
|
- | - | |
03 | 2.3132: Recharge batteries on during off-peak demand periods | $10,128 | $30,000 |
$10,128
-
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,770 | $7 |
$2,420
35,756
kWh
|
- | $(-650.0) | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,137 | $4,550 | - |
$5,137
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,140 | $250 | - |
$2,140
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,314 | $800 |
$2,314
34,291
kWh
|
- | - | |
08 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,641 | $1,000 |
$1,641
24,326
kWh
|
- | - | |
09 | 2.2511: Insulate bare equipment | $1,139 | $189 |
$1,139
16,706
kWh
|
- | - | |
10 | 2.2511: Insulate bare equipment | $460 | $295 |
$460
6,741
kWh
|
- | - | |
TOTAL RECOMMENDED | $50,965 | $42,091 |
$48,586
567,996
kWh
|
$3,029
-
MMBtu
|
$(-650.0) | ||
TOTAL IMPLEMENTED | $15,637 | $30,741 |
$14,147
59,203
kWh
|
$2,140
-
MMBtu
|
$(-650.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs