ITAC Assessment: UD1067
ITAC logo
ITAC Assessment: UD1067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Theatrical Productions
NAICS 711110: Theater Companies and Dinner Theaters
SIC 7922: Theatrical Producers (Except Motion Picture) and Miscellaneous Theatrical Services
Sales Range less than $500
k
# of Employees 9
Plant Area 10,000
ft2
Annual Production 4
units
Production Hrs. Annual 1,586
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,387 98,480
kWh
Natural Gas $6,223 479
MMBtu
TOTAL YEARLY COSTS $28,610
RECOMMENDED SAVINGS* $13,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $175 $1,800 $175
1,456
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $965 $6,400 - $965
-
MMBtu
03 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $377 $250 $377
3,139
kWh
-
04 2.9114: Use solar heat to make electricty $11,940 $143,080 $11,940
99,500
kWh
-
TOTAL RECOMMENDED $13,457 $151,530 $12,492
104,095
kWh
$965
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs