ITAC Assessment: KU0374
ITAC logo
ITAC Assessment: KU0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLEXIBLE PACKAGING
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 3,600,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,810 942,263
kWh
Natural Gas $8,759 2,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $4,932 $3,705 - $4,932
-
MMBtu
02 2.7261: Install timers and/or thermostats $2,477 - $2,176
35,463
kWh
$301
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $1,925 $4,800 $(-234.0)
(-3,810)
kWh
$2,159
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,651 $1,785 - $1,651
-
MMBtu
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $602 $1,066 - $602
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $403 - $575
9,379
kWh
$(-172.0)
-
MMBtu
07 2.2437: Recover waste heat from equipment $327 - - $327
-
MMBtu
TOTAL RECOMMENDED $12,317 $11,356 $2,517
41,032
kWh
$9,800
-
MMBtu
TOTAL IMPLEMENTED $4,730 $2,851 $2,176
35,463
kWh
$2,554
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs