Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area
n/a
Annual Production 90,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,112 5,235,932
kWh
Natural Gas $182,675 65,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,538 $15,000 - $8,538
-
MMBtu
-
02 2.2444: Use hot process fluids to preheat incoming process fluids $6,461 $15,000 - $6,461
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,538 $3,314 $3,538
50,703
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $309 - $309
4,396
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $3,338 $2,560 $3,338
47,773
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,483 - $1,862
26,671
kWh
- $(-379.0)
07 2.6232: Install set-back timers $2,086 $400 $2,086
29,894
kWh
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,000 - $2,410
34,584
kWh
$(-410.0)
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $957 $200 - $957
-
MMBtu
-
10 2.3132: Recharge batteries on during off-peak demand periods $423 - $423
-
kWh
- -
TOTAL RECOMMENDED $29,133 $36,474 $13,966
194,021
kWh
$15,546
-
MMBtu
$(-379.0)
TOTAL IMPLEMENTED $5,227 $3,514 $4,270
55,099
kWh
$957
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs