| Assessment Year | 1992 |
|---|---|
| Principal Product | VALVES FOR A/C REFRIGER. |
| NAICS |
n/a
|
| SIC | 3491: Industrial Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $166,660 | 1,910,317 |
kWh
|
$0.087 |
| Natural Gas | $35,045 | 10,385 |
MMBtu
|
$3.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,729 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,889 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $1,830 | $314 |
$(-72.0)
(-879)
kWh
|
$1,902
-
MMBtu
|
- | |
| 02 | 2.6232: Install set-back timers | $1,233 | $800 |
$1,233
14,068
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $249 | $244 |
$328
3,810
kWh
|
- | $(-79.0) | |
| 04 | 2.4312: Improve lubrication practices | $1,215 | - |
$1,215
14,068
kWh
|
- | - | |
| 05 | 2.2514: Cover open tanks | $967 | $500 | - |
$967
-
MMBtu
|
- | |
| 06 | 2.7494: Install storm windows and doors | $1,208 | $4,293 | - |
$1,208
-
MMBtu
|
- | |
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $658 | - |
$788
9,086
kWh
|
$(-130.0)
-
MMBtu
|
- | |
| 08 | 2.4322: Use or replace with energy efficient substitutes | $601 | $525 |
$601
7,034
kWh
|
- | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $498 | - |
$498
5,862
kWh
|
- | - | |
| 10 | 2.7261: Install timers and/or thermostats | $270 | $400 | - |
$270
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $8,729 | $7,076 |
$4,591
53,049
kWh
|
$4,217
-
MMBtu
|
$(-79.0) | ||
| TOTAL IMPLEMENTED | $5,889 | $6,576 |
$2,588
29,895
kWh
|
$3,380
-
MMBtu
|
$(-79.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs