ITAC Assessment: TT0183
ITAC logo
ITAC Assessment: TT0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Food and Aerosol Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 168
Plant Area 325,000
ft2
Annual Production 617,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,004 13,614,665
kWh
Electricity Demand $376,109 27,418
kW-mo/yr
Natural Gas $582,965 60,536
MMBtu
TOTAL YEARLY COSTS $1,449,078
RECOMMENDED SAVINGS* $61,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $22,849 $30,000 $(-1,322.0)
(-36,717)
kWh
$(-992.0)
-
kW-mo/yr
- $25,163
02 2.4239: Eliminate or reduce compressed air usage $13,441 $7,000 $7,696
213,783
kWh
$5,745
-
kW-mo/yr
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $11,488 $5,100 $11,488
319,114
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,005 $24,492 $5,005
139,031
kWh
$2,000
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,947 $1,400 - - $2,947
-
MMBtu
-
06 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $2,782 $7,000 - - $2,782
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,424 $125 $815
22,644
kWh
$609
-
kW-mo/yr
- -
TOTAL RECOMMENDED $61,936 $75,117 $23,682
657,855
kWh
$7,362
-
kW-mo/yr
$5,729
-
MMBtu
$25,163
TOTAL IMPLEMENTED $26,353 $12,225 $19,999
555,541
kWh
$6,354
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs