| Assessment Year | 1992 |
|---|---|
| Principal Product | ENVELOPES |
| NAICS |
n/a
|
| SIC | 2677: Envelopes |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $287,319 | 3,895,956 |
kWh
|
$0.074 |
| Natural Gas | $30,530 | 6,351 |
MMBtu
|
$4.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,318 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,296 | $5 |
$5,744
77,960
kWh
|
- | $(-448.0) | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,707 | $3,964 |
$4,707
63,892
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $408 | - |
$408
5,569
kWh
|
- | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,297 | $1,300 | - |
$3,297
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,704 | $2,250 | - |
$3,704
-
MMBtu
|
- | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $4,091 | - |
$4,091
-
kWh
|
- | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,811 | $1,500 |
$2,811
38,394
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $2,137 | $1,280 |
$2,137
29,015
kWh
|
- | - | |
| 09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,087 | - |
$2,887
-
kWh
|
- | $(-800.0) | |
| 10 | 2.6212: Turn off equipment during breaks, reduce operating time | $471 | - |
$471
6,448
kWh
|
- | - | |
| 11 | 2.4133: Use most efficient type of electric motors | $1,202 | $2,292 |
$1,202
16,413
kWh
|
- | - | |
| 12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $305 | $500 | - |
$305
-
MMBtu
|
- | |
| 13 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $316 | $200 |
$316
4,396
kWh
|
- | - | |
| TOTAL RECOMMENDED | $30,832 | $13,291 |
$24,774
242,087
kWh
|
$7,306
-
MMBtu
|
$(-1,248.0) | ||
| TOTAL IMPLEMENTED | $13,318 | $9,806 |
$6,317
85,874
kWh
|
$7,001
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs