ITAC Assessment: UF0046
ITAC logo
ITAC Assessment: UF0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Airline Ticket Equipment
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 49,600
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,244 1,255,276
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,273 $1,140 $5,273
76,495
kWh
02 2.7144: Install spectral reflectors / delamp $12,645 $26,100 $12,645
151,817
kWh
03 2.7135: Install occupancy sensors $946 $256 $946
13,775
kWh
04 2.4133: Use most efficient type of electric motors $47 $111 $47
586
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $6,351 $6,575 $6,351
92,028
kWh
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,229 $700 $1,229
17,878
kWh
TOTAL RECOMMENDED $26,491 $34,882 $26,491
352,579
kWh
TOTAL IMPLEMENTED $12,900 $8,526 $12,900
186,987
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs