Assessment Year | 1991 |
---|---|
Principal Product | ACCENT FURNITURE |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 90,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,821 | 346,131 |
kWh
|
$0.092 |
Natural Gas | $33,187 | 8,060 |
MMBtu
|
$4.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7494: Install storm windows and doors | $6,942 | $26,000 |
$(-509.0)
(-5,569)
kWh
|
$7,451
-
MMBtu
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $593 | $700 | - |
$593
-
MMBtu
|
- | |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $137 | $302 | - |
$137
-
MMBtu
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $930 | $2,004 |
$(-140.0)
(-1,465)
kWh
|
$1,070
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $120 | - |
$195
2,052
kWh
|
- | $(-75.0) | |
06 | 2.4221: Install compressor air intakes in coolest locations | $517 | $640 |
$517
5,569
kWh
|
- | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $500 | $50 |
$500
-
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $145 | - |
$145
1,465
kWh
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $97 | - |
$97
1,172
kWh
|
- | - | |
TOTAL RECOMMENDED | $9,981 | $29,696 |
$805
3,224
kWh
|
$9,251
-
MMBtu
|
$(-75.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs