ITAC Assessment: MZ1009
ITAC logo
ITAC Assessment: MZ1009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fire House
NAICS 922160: Fire Protection
SIC 6221: Commodity Contracts Brokers and Dealers
Sales Range less than $500
k
# of Employees 12
Plant Area 25,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,271 283,920
kWh
Natural Gas $6,684 596
MMBtu
TOTAL YEARLY COSTS $39,955
RECOMMENDED SAVINGS* $3,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $82 $160 $82
700
kWh
-
02 2.6218: Turn off equipment when not in use $695 $190 $695
5,940
kWh
-
03 2.9112: Use solar heat to heat water $597 $3,500 $597
5,105
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $2,377 $2,964 - $2,377
-
MMBtu
TOTAL RECOMMENDED $3,751 $6,814 $1,374
11,745
kWh
$2,377
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs