ITAC Assessment: OR0301
ITAC logo
ITAC Assessment: OR0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Mineral Wool
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 35,000
ft2
Annual Production 19,919
ton
Production Hrs. Annual 6,120
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,696 8,025,498
kWh
Electricity Demand $86,013 232,992
kW-mo/yr
Electricity Fees $8,237 -
Natural Gas $149,347 41,043
MMBtu
Other Energy $889,224 110,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,821

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.3127: Use adsorption, ion exchange to remove contaminants $20,180 $2,500 - - - - - - - $(-280.0) - $20,460
02 3.1191: Change procedures / equipment / operating conditions $45,520 $74,000 - - - - $360
-
MMBtu
$7,025
-
lb
- - $38,135 -
03 3.1191: Change procedures / equipment / operating conditions $31,298 $34,800 - - - - $248
-
MMBtu
$4,830
-
lb
- - $26,220 -
04 3.1191: Change procedures / equipment / operating conditions $27,796 $8,400 - - - - $96
-
MMBtu
- $4,590 - $10,010 $13,100
05 2.2414: Use waste heat from hot flue gases to preheat $23,300 $104,000 - - - $23,300
-
MMBtu
- - - - - -
06 2.4322: Use or replace with energy efficient substitutes $3,230 $9,400 $1,800
84,115
kWh
$1,430
-
kW-mo/yr
- - - - - - - -
07 2.3212: Optimize plant power factor $7,222 $16,000 - - $7,222 - - - - - - -
08 2.4133: Use most efficient type of electric motors $6,369 $13,594 $4,470
208,968
kWh
$1,899
-
kW-mo/yr
- - - - - - - -
09 2.4226: Use / purchase optimum sized compressor $6,104 $26,180 $4,483
209,555
kWh
$1,621
-
kW-mo/yr
- - - - - - - -
10 2.7124: Make a practice of turning off lights when not needed $2,732 - $1,566
73,271
kWh
- - - - - $144 - - $1,022
TOTAL RECOMMENDED $173,751 $288,874 $12,319
575,909
kWh
$4,950
-
kW-mo/yr
$7,222 $23,300
-
MMBtu
$704
-
MMBtu
$11,855
-
lb
$4,734 $(-280.0) $74,365 $34,582
TOTAL IMPLEMENTED $16,821 $38,994 $6,270
293,083
kWh
$3,329
-
kW-mo/yr
$7,222 - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs