ITAC Assessment: WI0133
ITAC logo
ITAC Assessment: WI0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FRUIT JUICES
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 12,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,887 1,712,192
kWh
Natural Gas $55,188 14,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $13,543 - $9,675
-
kWh
$3,868
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,875 $3,000 - $2,875
-
MMBtu
03 2.3132: Recharge batteries on during off-peak demand periods $2,708 - $2,708
-
kWh
-
04 2.2437: Recover waste heat from equipment $706 $1,000 - $706
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $452 $800 - $452
-
MMBtu
06 2.7261: Install timers and/or thermostats $429 $200 - $429
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $203 - $203
3,224
kWh
-
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $91 $236 - $91
-
MMBtu
TOTAL RECOMMENDED $21,007 $5,236 $12,586
3,224
kWh
$8,421
-
MMBtu
TOTAL IMPLEMENTED $21,007 $5,236 $12,586
3,224
kWh
$8,421
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs