ITAC Assessment: KU0057
ITAC logo
ITAC Assessment: KU0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product COOKBOOKS
NAICS
n/a
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,114
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,652 266,120
kWh
Natural Gas $1,670 461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,441 $888 $2,441
34,877
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $1,030 $2,800 $1,030
14,654
kWh
-
03 2.7261: Install timers and/or thermostats $545 $300 $183
2,638
kWh
$362
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $418 $438 - $418
-
MMBtu
05 2.8118: Check for accuracy of utility / power meters $296 - $296
-
kWh
-
06 2.1123: Install automatic stack damper $135 $275 - $135
-
MMBtu
07 2.6121: Reduce hot water temperature to the minimum required $939 - $939
13,482
kWh
-
08 2.2511: Insulate bare equipment $604 $59 $604
8,499
kWh
-
TOTAL RECOMMENDED $6,408 $4,760 $5,493
74,150
kWh
$915
-
MMBtu
TOTAL IMPLEMENTED $3,028 $3,872 $2,113
25,791
kWh
$915
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs