Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MAYONNAISE,MARGARINE
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 218,800,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,099,310 18,055,686
kWh
Natural Gas $714,690 288,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $963,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $20,052 $15,000 $20,052
-
kWh
-
02 2.2621: Modify refrigeration system to operate at a lower pressure $12,150 $7,000 $12,150
202,521
kWh
-
03 2.3132: Recharge batteries on during off-peak demand periods $8,373 $16,000 $8,373
-
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,042 $2,560 $3,042
46,893
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $2,019 - $2,019
33,118
kWh
-
06 2.4133: Use most efficient type of electric motors $140 $276 $140
2,345
kWh
-
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $389 $283 - $389
-
MMBtu
08 2.7261: Install timers and/or thermostats $138 $400 - $138
-
MMBtu
09 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $917,100 - $1,095,660
18,000,000
kWh
$(-178,560.0)
-
MMBtu
TOTAL RECOMMENDED $963,403 $41,519 $1,141,436
18,284,877
kWh
$(-178,033.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs