ITAC Assessment: DS0133
ITAC logo
ITAC Assessment: DS0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Custom Commercial Cabinetry
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 112,000
ft2
Annual Production 67
thousand feet
Production Hrs. Annual 5,512
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,226 1,683,177
kWh
Electricity Demand $39,987 6,012
kW-mo/yr
Electricity Fees $4,883 -
Natural Gas $15,409 2,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $865 $324 $865
25,498
kWh
- - - - - -
02 2.2437: Recover waste heat from equipment $863 $1,010 - - $863
-
MMBtu
- - - -
03 2.4221: Install compressor air intakes in coolest locations $221 $375 $156
4,689
kWh
$65
-
kW-mo/yr
- - - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $13,380 $3,000 - - - - - $13,380 -
05 3.4151: Minimize water usage $340 $230 - - - - - - $340
-
Tgal
06 4.446: Automate finishing process $1,925 $4,900 - - - $1,925 - - -
07 4.821: Pay bills on time to avoid late fees $656 - - - - - $656 - -
TOTAL RECOMMENDED $18,250 $9,839 $1,021
30,187
kWh
$65
-
kW-mo/yr
$863
-
MMBtu
$1,925 $656 $13,380 $340
-
Tgal
TOTAL IMPLEMENTED $17,910 $9,609 $1,021
30,187
kWh
$65
-
kW-mo/yr
$863
-
MMBtu
$1,925 $656 $13,380 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs