ITAC Assessment: OD0078
ITAC logo
ITAC Assessment: OD0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aquatic Sports Equipment
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 160,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,564 1,047,480
kWh
Electricity Demand $22,053 3,764
kW-mo/yr
Electricity Fees $4,935 -
Natural Gas $63,115 15,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $189,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,363 $1,118 $3,301
63,306
kWh
$62
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,909 $800 $4,909
91,442
kWh
- - - -
03 2.6218: Turn off equipment when not in use $205 $360 $205
3,810
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $297 $453 $242
4,689
kWh
$55
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,337 $1,495 - - $4,337
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $2,717 $3,000 - - $2,717
-
MMBtu
- -
07 3.6192: Use a less expensive method of waste removal $12,812 - - - - $12,812
-
lb
-
08 4.122: Develop standard procedures to improve internal yields $167,522 - - - - $1,294
-
lb
$166,228
TOTAL RECOMMENDED $196,162 $7,226 $8,657
163,247
kWh
$117
-
kW-mo/yr
$7,054
-
MMBtu
$14,106
-
lb
$166,228
TOTAL IMPLEMENTED $189,580 $2,295 $4,909
91,442
kWh
- $4,337
-
MMBtu
$14,106
-
lb
$166,228
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs