Assessment Year | 1991 |
---|---|
Principal Product | PAPER, TRANSPARENT TUBES |
NAICS |
n/a
|
SIC | 2655: Fiber Cans, Tubes, Drums, and Similar Products |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 50,100,000
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,936 | 1,409,730 |
kWh
|
$0.077 |
Natural Gas | $56,229 | 13,032 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,296 | - |
$6,016
-
kWh
|
- | $(-720.0) | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,875 | $14,296 |
$(-270.0)
(-3,517)
kWh
|
$4,145
-
MMBtu
|
- | |
03 | 2.3191: Use demand controller or load shedder | $2,832 | $10,000 |
$2,832
-
kWh
|
- | - | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $1,020 | $400 |
$1,020
-
kWh
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,204 | - |
$1,204
15,533
kWh
|
- | - | |
06 | 2.6124: Establish equipment maintenance schedule | $505 | $400 |
$505
6,448
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $672 | $1,280 |
$672
8,792
kWh
|
- | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $134 | - |
$134
1,758
kWh
|
- | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $3,292 | $5,000 | - |
$3,292
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $18,830 | $31,376 |
$12,113
29,014
kWh
|
$7,437
-
MMBtu
|
$(-720.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs