ITAC Assessment: WI0119
ITAC logo
ITAC Assessment: WI0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PACKAGING MACHINERY
NAICS
n/a
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 120
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,176 1,773,740
kWh
Natural Gas $23,498 4,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $4,106 $500 - $4,106
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,961 - - $5,524
-
MMBtu
$(-1,563.0)
03 2.7224: Reduce space conditioning during non-working hours $3,287 - - $3,287
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $735 $1,355 $735
10,551
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $430 $1,280 $430
6,155
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $469 - $469
6,741
kWh
- -
07 2.7261: Install timers and/or thermostats $321 $200 - $321
-
MMBtu
-
TOTAL RECOMMENDED $13,309 $3,335 $1,634
23,447
kWh
$13,238
-
MMBtu
$(-1,563.0)
TOTAL IMPLEMENTED $13,309 $3,335 $1,634
23,447
kWh
$13,238
-
MMBtu
$(-1,563.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs