Assessment Year | 1991 |
---|---|
Principal Product | PACKAGING MACHINERY |
NAICS |
n/a
|
SIC | 3565: Packaging Machinery |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 120
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,176 | 1,773,740 |
kWh
|
$0.070 |
Natural Gas | $23,498 | 4,209 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,309 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $4,106 | $500 | - |
$4,106
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,961 | - | - |
$5,524
-
MMBtu
|
$(-1,563.0) | |
03 | 2.7224: Reduce space conditioning during non-working hours | $3,287 | - | - |
$3,287
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $735 | $1,355 |
$735
10,551
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $430 | $1,280 |
$430
6,155
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $469 | - |
$469
6,741
kWh
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $321 | $200 | - |
$321
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $13,309 | $3,335 |
$1,634
23,447
kWh
|
$13,238
-
MMBtu
|
$(-1,563.0) | ||
TOTAL IMPLEMENTED | $13,309 | $3,335 |
$1,634
23,447
kWh
|
$13,238
-
MMBtu
|
$(-1,563.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs