ITAC Assessment: LM0086
ITAC logo
ITAC Assessment: LM0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product food
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 250,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,767 3,461,654
kWh
Electricity Demand $119,899 8,676
kW-mo/yr
Electricity Fees $6,068 -
Natural Gas $193,816 26,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $238 $200 $204
2,344
kWh
$34
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $386 $735 $330
3,800
kWh
$56
-
kW-mo/yr
-
03 2.4225: Install common header on compressors $1,631 - $1,394
16,051
kWh
$237
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,787 $13,324 $5,633
64,877
kWh
$1,154
-
kW-mo/yr
-
05 4.322: Eliminate old stock and modify inventory control $75,000 $8,800 - - $75,000
TOTAL RECOMMENDED $84,042 $23,059 $7,561
87,072
kWh
$1,481
-
kW-mo/yr
$75,000
TOTAL IMPLEMENTED $9,042 $14,259 $7,561
87,072
kWh
$1,481
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs