Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WHEEL BARRELS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 1,750,000
pieces
Production Hrs. Annual 3,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,302 2,423,505
kWh
Natural Gas $192,235 55,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $22,344 - - $22,344
-
MMBtu
02 2.7261: Install timers and/or thermostats $11,458 $200 - $11,458
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,546 $200 - $3,546
-
MMBtu
04 2.7494: Install storm windows and doors $6,299 $24,394 - $6,299
-
MMBtu
05 2.2511: Insulate bare equipment $256 $225 - $256
-
MMBtu
06 2.3191: Use demand controller or load shedder $6,972 $10,000 $6,972
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,835 $12,207 $2,835
26,084
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $879 $2,340 $879
8,206
kWh
-
09 2.6232: Install set-back timers $470 $200 $470
4,396
kWh
-
10 2.2414: Use waste heat from hot flue gases to preheat $1,614 $5,000 - $1,614
-
MMBtu
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,059 - $1,059
9,672
kWh
-
12 2.4312: Improve lubrication practices $968 - $968
8,792
kWh
-
13 2.4111: Utilize energy-efficient belts and other improved mechanisms $854 $1,270 $854
7,913
kWh
-
14 2.4133: Use most efficient type of electric motors $56 $191 $56
586
kWh
-
15 2.7226: Use computer programs to optimize hvac performance $361 $700 $361
3,224
kWh
-
TOTAL RECOMMENDED $59,971 $56,927 $14,454
68,873
kWh
$45,517
-
MMBtu
TOTAL IMPLEMENTED $59,971 $56,927 $14,454
68,873
kWh
$45,517
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs