Assessment Year | 2005 |
---|---|
Principal Product | warming blankets and warming units |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
140,000
ft2
|
Annual Production | 10,010,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $6,550 | 180,542 |
kWh
|
$0.036 |
Electricity Demand | $6,001 | 780 |
kW-mo/yr
|
$7.69 |
Natural Gas | $59,734 | 6,675 |
MMBtu
|
$8.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,387 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,029 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $781 | $25 |
$529
14,560
kWh
|
$252
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,729 | $429 |
$1,851
50,960
kWh
|
$878
-
kW-mo/yr
|
- | |
03 | 2.4234: Cool compressor air intake with heat exchanger | $919 | $172 |
$613
16,924
kWh
|
$306
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,960 | $1,114 | - | - |
$2,960
-
MMBtu
|
|
05 | 2.2531: Re-size charging openings or add movable cover or door | $421 | $850 | - | - |
$421
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $577 | $1,080 |
$359
12,654
kWh
|
$218
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $8,387 | $3,670 |
$3,352
95,098
kWh
|
$1,654
-
kW-mo/yr
|
$3,381
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,029 | $2,565 |
$2,464
67,884
kWh
|
$1,184
-
kW-mo/yr
|
$3,381
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs