Assessment Year | 1991 |
---|---|
Principal Product | DOORS AND WINDOWS |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,282 | 772,861 |
kWh
|
$0.092 |
Natural Gas | $24,068 | 8,983 |
MMBtu
|
$2.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,210 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,210 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,416 | $3,500 | - |
$5,416
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,123 | $546 |
$1,123
12,309
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $282 | $500 | - |
$282
-
MMBtu
|
|
04 | 2.1221: Replace obsolete burners with more efficient ones | $1,840 | $9,000 | - |
$1,840
-
MMBtu
|
|
05 | 2.7494: Install storm windows and doors | $1,141 | $6,311 | - |
$1,141
-
MMBtu
|
|
06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,062 | $2,214 |
$1,062
11,430
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $346 | $800 |
$346
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $11,210 | $22,871 |
$2,531
27,549
kWh
|
$8,679
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,210 | $22,871 |
$2,531
27,549
kWh
|
$8,679
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs