ITAC Assessment: MO0123
ITAC logo
ITAC Assessment: MO0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Wheels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 303,000
ft2
Annual Production 7,200,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,467,293 28,919,109
kWh
Natural Gas $400,919 134,971
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,626 $1,295 - $9,626
-
MMBtu
02 2.4133: Use most efficient type of electric motors $45,665 $88,767 $45,665
899,472
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,145 $515 $2,145
42,204
kWh
-
04 2.4314: Use synthetic lubricant $9,743 $4,240 $9,743
191,970
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,740 $856 $3,740
73,564
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,629 $20,506 $7,629
150,352
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $207 $412 $207
4,103
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $8,177 $2,885 $8,177
161,196
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $915 $599 $915
18,171
kWh
-
TOTAL RECOMMENDED $87,847 $120,075 $78,221
1,541,032
kWh
$9,626
-
MMBtu
TOTAL IMPLEMENTED $57,643 $90,989 $48,017
945,779
kWh
$9,626
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs