Assessment Year | 1991 |
---|---|
Principal Product | AUDIO EQUIPMENT |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,724 | 1,707,210 |
kWh
|
$0.095 |
Natural Gas | $55,196 | 16,196 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,784 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,784 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $13,347 | $6,250 | - |
$13,347
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $6,683 | - | - |
$6,683
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $3,030 | - |
$3,030
31,946
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,688 | $16,237 |
$4,688
49,531
kWh
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,530 | $500 | - |
$1,530
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $716 | $800 | - |
$716
-
MMBtu
|
|
07 | 2.7494: Install storm windows and doors | $803 | $2,466 | - |
$803
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $508 | $700 |
$508
5,275
kWh
|
- | |
09 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,254 | - |
$1,254
13,189
kWh
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $225 | - |
$225
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $32,784 | $26,953 |
$9,705
102,286
kWh
|
$23,079
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,784 | $26,953 |
$9,705
102,286
kWh
|
$23,079
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs