| Assessment Year | 1991 |
|---|---|
| Principal Product | FASTENERS |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $5 M to 10M |
| # of Employees | 102 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85,575 | 908,265 |
kWh
|
$0.094 |
| Natural Gas | $60,503 | 13,409 |
MMBtu
|
$4.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,052 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,052 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $2,400 | $10,000 |
$2,400
-
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $893 | $232 |
$893
9,379
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,190 | $400 |
$1,190
12,603
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $487 | $250 | - |
$487
-
MMBtu
|
|
| 05 | 2.7494: Install storm windows and doors | $758 | $2,514 | - |
$758
-
MMBtu
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $53 | $190 |
$53
586
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $271 | $117 | - |
$271
-
MMBtu
|
|
| TOTAL RECOMMENDED | $6,052 | $13,703 |
$4,536
22,568
kWh
|
$1,516
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,052 | $13,703 |
$4,536
22,568
kWh
|
$1,516
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs