ITAC Assessment: WI0098
ITAC logo
ITAC Assessment: WI0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ALUMINUM CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 975,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,432 19,977,726
kWh
Natural Gas $434,048 124,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $317 $500 - $367
-
MMBtu
$(-50.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,226 $8,680 $4,226
115,182
kWh
- -
03 2.4133: Use most efficient type of electric motors $634 $1,350 $634
17,292
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,208 $1,224 $1,208
33,411
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $1,605 - - $1,605
-
MMBtu
-
06 2.6232: Install set-back timers $1,304 $1,000 $1,304
35,463
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,254 - $1,254
34,291
kWh
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,065 $750 - $1,065
-
MMBtu
-
09 2.7224: Reduce space conditioning during non-working hours $1,274 $500 - $1,274
-
MMBtu
-
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $342 $509 - $342
-
MMBtu
-
11 2.6214: Shut off pilots in standby equipment $88 - - $88
-
MMBtu
-
TOTAL RECOMMENDED $13,317 $14,513 $8,626
235,639
kWh
$4,741
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $7,761 $11,254 $6,068
165,885
kWh
$1,693
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs