| Assessment Year | 2018 |
|---|---|
| Principal Product | Potato and Corn Chips |
| NAICS | 311919: Other Snack Food Manufacturing |
| SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
| Sales Range | greater than $500 M |
| # of Employees | 350 |
| Plant Area |
300,000
ft2
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $688,235 | 14,735,370 |
kWh
|
$0.047 | |
| Electricity Demand | $160,520 | 27,038 |
kW-mo/yr
|
$5.94 | |
| Electricity Fees | $23,740 | - |
|
- | |
| Natural Gas | $1,182,798 | 315,758 |
MMBtu
|
$3.75 | |
| Waste Disposal Costs | |||||
| Water Usage | $384,872 | 159,192 |
Tgal
|
$2.42 | |
| Solid Waste (non-haz) | $348,130 | 2,248,817 |
lb
|
$0.15 | |
| TOTAL YEARLY COSTS | $2,788,295 | ||||
| RECOMMENDED SAVINGS* | $331,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $225,013 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $200,991 | $689,600 |
$(-41,679.0)
(-848,854)
kWh
|
$(-7,733.0)
-
kW-mo/yr
|
- |
$250,403
-
lb
|
|
| 02 | 2.1224: Replace boiler | $56,825 | $365,566 |
$804
16,378
kWh
|
- |
$56,021
-
MMBtu
|
- | |
| 03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $33,804 | $25,271 | - | - |
$33,804
-
MMBtu
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $16,006 | $21,662 | - | - |
$16,006
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $17,619 | $17,511 | - | - |
$17,619
-
MMBtu
|
- | |
| 06 | 2.5196: Use small number of high output units instead of many small inefficient units | $6,403 | $30,000 |
$5,493
111,874
kWh
|
$910
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $331,648 | $1,149,610 |
$(-35,382.0)
(-720,602)
kWh
|
$(-6,823.0)
-
kW-mo/yr
|
$123,450
-
MMBtu
|
$250,403
-
lb
|
||
| TOTAL IMPLEMENTED | $225,013 | $737,111 |
$(-36,186.0)
(-736,980)
kWh
|
$(-6,823.0)
-
kW-mo/yr
|
$17,619
-
MMBtu
|
$250,403
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs