ITAC Assessment: OR0712
ITAC logo
ITAC Assessment: OR0712
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Potato and Corn Chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range greater than $500
M
# of Employees 350
Plant Area 300,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $688,235 14,735,370
kWh
Electricity Demand $160,520 27,038
kW-mo/yr
Electricity Fees $23,740 -
Natural Gas $1,182,798 315,758
MMBtu
Waste Disposal Costs
Water Usage $384,872 159,192
Tgal
Solid Waste (non-haz) $348,130 2,248,817
lb
TOTAL YEARLY COSTS $2,788,295
RECOMMENDED SAVINGS* $331,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $225,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $200,991 $689,600 $(-41,679.0)
(-848,854)
kWh
$(-7,733.0)
-
kW-mo/yr
- $250,403
-
lb
02 2.1224: Replace boiler $56,825 $365,566 $804
16,378
kWh
- $56,021
-
MMBtu
-
03 2.2444: Use hot process fluids to preheat incoming process fluids $33,804 $25,271 - - $33,804
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $16,006 $21,662 - - $16,006
-
MMBtu
-
05 2.2511: Insulate bare equipment $17,619 $17,511 - - $17,619
-
MMBtu
-
06 2.5196: Use small number of high output units instead of many small inefficient units $6,403 $30,000 $5,493
111,874
kWh
$910
-
kW-mo/yr
- -
TOTAL RECOMMENDED $331,648 $1,149,610 $(-35,382.0)
(-720,602)
kWh
$(-6,823.0)
-
kW-mo/yr
$123,450
-
MMBtu
$250,403
-
lb
TOTAL IMPLEMENTED $225,013 $737,111 $(-36,186.0)
(-736,980)
kWh
$(-6,823.0)
-
kW-mo/yr
$17,619
-
MMBtu
$250,403
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs