Assessment Year | 2012 |
---|---|
Principal Product | Various types of cargo, utility, and RV trailers |
NAICS | 336214: Travel Trailer and Camper Manufacturing |
SIC | 3792: Travel Trailers and Campers |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
96,000
ft2
|
Annual Production | 5,200
pieces
|
Production Hrs. Annual | 3,400
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,283 | 547,749 |
kWh
|
$0.048 |
Electricity Demand | $9,386 | 2,714 |
kW-mo/yr
|
$3.46 |
Electricity Fees | $971 | - |
|
- |
Natural Gas | $12,790 | 1,613 |
MMBtu
|
$7.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,760 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $1,790 | $4,911 |
$1,362
28,380
kWh
|
$428
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,760 | $649 |
$2,861
59,620
kWh
|
$900
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $98 | - |
$98
2,045
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $186 | $300 |
$186
3,875
kWh
|
- | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,845 | $6,260 |
$1,845
38,456
kWh
|
- | - | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,204 | $7,725 | - | - |
$3,204
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,883 | $19,845 |
$6,351
132,376
kWh
|
$1,328
-
kW-mo/yr
|
$3,204
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,760 | $649 |
$2,861
59,620
kWh
|
$900
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs