Assessment Year | 1998 |
---|---|
Principal Product | Marine Hardware |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
425,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $349,118 | 7,712,485 |
kWh
|
$0.045 |
Electricity Demand | $310,113 | 33,153 |
kW-mo/yr
|
$9.35 |
Natural Gas | $109,733 | 17,172 |
MMBtu
|
$6.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $324,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,736 | $9,303 |
$2,879
63,892
kWh
|
$2,857
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $4,090 | $200 |
$2,048
45,428
kWh
|
$2,042
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,250 | $42,433 |
$7,877
174,971
kWh
|
$6,373
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $10,241 | $4,206 |
$5,360
118,992
kWh
|
$4,881
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,310 | $1,200 |
$12,310
144,783
kWh
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $24,336 | $3,600 | - | - |
$24,336
-
MMBtu
|
- | - | |
07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $3,029 | $10,283 |
$984
21,981
kWh
|
$2,045
-
kW-mo/yr
|
- | - | - | |
08 | 3.4151: Minimize water usage | $3,060 | $3,300 | - | - | - |
$3,060
-
Tgal
|
- | |
09 | 3.3127: Use adsorption, ion exchange to remove contaminants | $157,194 | $233,000 | - | - | - |
$157,194
-
Tgal
|
- | |
10 | 2.8113: Purchase gas directly from a contract gas supplier | $12,020 | - | - | - | - | - | $12,020 | |
11 | 2.8121: Apply for tax-free status for energy purchases | $73,408 | $920 | - | - | - | - | $73,408 | |
12 | 4.111: Add equipment/ operators to reduce production bottleneck | $4,615 | $4,000 | - | - | - | - | $4,615 | |
TOTAL RECOMMENDED | $324,289 | $312,445 |
$31,458
570,047
kWh
|
$18,198
-
kW-mo/yr
|
$24,336
-
MMBtu
|
$160,254
-
Tgal
|
$90,043 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs