ITAC Assessment: WI0090
ITAC logo
ITAC Assessment: WI0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BREAD AND ROLLS
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,830 8,478,898
kWh
Natural Gas $394,887 119,896
MMBtu
Other Energy $108,000 11,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,418 $1,203 $9,418
145,076
kWh
- -
02 2.8223: Add air shields to trucks to increase fuel mileage $3,240 - - - $3,240
-
MMBtu
03 2.3132: Recharge batteries on during off-peak demand periods $1,616 $4,600 $1,616
-
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $892 $1,955 $892
13,775
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $751 $500 - $751
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $2,126 $4,000 $2,126
32,825
kWh
- -
07 2.6232: Install set-back timers $410 $200 $410
6,448
kWh
- -
TOTAL RECOMMENDED $18,453 $12,458 $14,462
198,124
kWh
$751
-
MMBtu
$3,240
-
MMBtu
TOTAL IMPLEMENTED $9,418 $1,203 $9,418
145,076
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs