ITAC Assessment: WI0083
ITAC logo
ITAC Assessment: WI0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CUSTOM LOOSELEAF BINDERS
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,093 1,525,791
kWh
Natural Gas $53,220 10,111
MMBtu
Fuel Oil #2 $12,804 3,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.8113: Purchase gas directly from a contract gas supplier $26,686 $500 - $26,686
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,462 $2,500 $9,750
57,151
kWh
$(-1,288.0)
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $7,033 - - $7,033
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $923 $1,607 $923
12,603
kWh
- -
05 2.7492: Use proper thickness of insulation on building envelope $2,409 $4,908 - - $2,409
-
MMBtu
06 2.2533: Replace air curtain doors with solid doors $1,655 $2,000 - $1,655
-
MMBtu
-
07 2.6232: Install set-back timers $338 $200 $338
4,689
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $210 $1,000 $210
2,931
kWh
- -
TOTAL RECOMMENDED $47,716 $12,715 $11,221
77,374
kWh
$34,086
-
MMBtu
$2,409
-
MMBtu
TOTAL IMPLEMENTED $26,686 $500 - $26,686
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs