ITAC Assessment: UF0358
ITAC logo
ITAC Assessment: UF0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 55,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,456,101 -
Electricity Demand $3,853 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,514

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $456 $503 $456
9,704
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $475 $2,300
48,929
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,147 - $2,147
45,680
kWh
- - -
04 2.4227: Use compressor air filters $2,203 $630 $632
13,440
kWh
$1,571
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,181 $10,652 $3,724
79,237
kWh
$457
-
kW-mo/yr
- -
06 2.7233: Use properly designed and sized hvac equipment $1,690 $4,100 $1,690
35,949
kWh
- - -
07 2.7423: Reduce heat gain by window tinting $1,109 $2,268 $1,109
23,587
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,854 $1,935 $826
17,579
kWh
$2,028
-
kW-mo/yr
- -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,719 $8,000 - - $4,719
-
lb
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $1,430 $4,800 - - $1,430
-
lb
-
11 2.8123: Pay utility bills on time $856 - - - - $856
TOTAL RECOMMENDED $23,944 $33,363 $12,883
274,105
kWh
$4,056
-
kW-mo/yr
$6,149
-
lb
$856
TOTAL IMPLEMENTED $17,514 $22,025 $9,911
210,873
kWh
$2,028
-
kW-mo/yr
$4,719
-
lb
$856
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs