ITAC Assessment: WI0072
ITAC logo
ITAC Assessment: WI0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FOLDING CARTONS
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 1,800
ton
Production Hrs. Annual 4,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,068 1,091,149
kWh
Natural Gas $10,028 2,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,236 - $3,636
-
kWh
- $(-400.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $564 $3,238 $564
6,741
kWh
- -
03 2.4312: Improve lubrication practices $1,866 - $1,866
22,567
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,052 $1,000 - $1,052
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $328 $700 $407
4,982
kWh
$(-79.0)
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $301 $250 - $301
-
MMBtu
-
07 2.7446: Utilize sensors controlling roof and wall openings $283 $400 $283
3,517
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $165 - $165
2,052
kWh
- -
09 2.6214: Shut off pilots in standby equipment $133 - - $133
-
MMBtu
-
10 2.6121: Reduce hot water temperature to the minimum required $730 - $730
9,086
kWh
- -
TOTAL RECOMMENDED $8,658 $5,588 $7,651
48,945
kWh
$1,407
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $5,536 $250 $5,502
22,567
kWh
$434
-
MMBtu
$(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs