ITAC Assessment: UL2315
ITAC logo
ITAC Assessment: UL2315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Contracted powder coating services for metal parts mainly electrical equipment
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 73,750
ft2
Annual Production 2,493
units
Production Hrs. Annual 2,493
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,410 1,070,372
kWh
Electricity Demand $38,725 6,206
kW-mo/yr
Electricity Fees $26,199 -
Natural Gas $172,257 42,168
MMBtu
TOTAL YEARLY COSTS $321,591
RECOMMENDED SAVINGS* $52,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $19,703 $150,942 $17,259
218,851
kWh
$2,444
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,783 $12,225 $9,783
124,055
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,528 $1,620 $5,528
69,980
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,612 $8,564 $5,080
55,827
kWh
$1,532
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $2,583 $1,264 $2,583
32,691
kWh
- -
06 2.2437: Recover waste heat from equipment $8,527 $31,200 - - $8,527
-
MMBtu
TOTAL RECOMMENDED $52,736 $205,815 $40,233
501,404
kWh
$3,976
-
kW-mo/yr
$8,527
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs