| Assessment Year | 1992 |
|---|---|
| Principal Product | PRINTING/BINDING BOOKS |
| NAICS |
n/a
|
| SIC | 2731: Books: Publishing, or Publishing and Printing |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 5,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $252,157 | 3,128,077 |
kWh
|
$0.081 |
| Fuel Oil #2 | $50,726 | 9,015 |
MMBtu
|
$5.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,601 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,838 | $3,915 |
$6,838
84,994
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,003 | - |
$1,003
12,603
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,382 | $7 |
$3,863
47,773
kWh
|
- | $(-481.0) | |
| 04 | 2.3132: Recharge batteries on during off-peak demand periods | $2,601 | - |
$2,601
-
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,537 | $1,300 | - |
$1,537
-
MMBtu
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $600 | $640 |
$600
7,327
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $191 | $178 |
$191
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $16,152 | $6,040 |
$15,096
155,042
kWh
|
$1,537
-
MMBtu
|
$(-481.0) | ||
| TOTAL IMPLEMENTED | $2,601 | - |
$2,601
-
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs