ITAC Assessment: WI0157
ITAC logo
ITAC Assessment: WI0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PRINTING/BINDING BOOKS
NAICS
n/a
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,157 3,128,077
kWh
Fuel Oil #2 $50,726 9,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,838 $3,915 $6,838
84,994
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,003 - $1,003
12,603
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,382 $7 $3,863
47,773
kWh
- $(-481.0)
04 2.3132: Recharge batteries on during off-peak demand periods $2,601 - $2,601
-
kWh
- -
05 2.2437: Recover waste heat from equipment $1,537 $1,300 - $1,537
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $600 $640 $600
7,327
kWh
- -
07 2.2511: Insulate bare equipment $191 $178 $191
2,345
kWh
- -
TOTAL RECOMMENDED $16,152 $6,040 $15,096
155,042
kWh
$1,537
-
MMBtu
$(-481.0)
TOTAL IMPLEMENTED $2,601 - $2,601
-
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs