ITAC Assessment: WI0071
ITAC logo
ITAC Assessment: WI0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CANDIES & SYRUPS
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,776 2,537,222
kWh
Natural Gas $108,022 30,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $3,005 $5,000 - $3,005
-
MMBtu
-
02 2.3132: Recharge batteries on during off-peak demand periods $2,737 - $2,737
-
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,686 $2,400 - $1,686
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $1,542 $580
8,792
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,333 $500 - $1,383
-
MMBtu
$(-50.0)
06 2.6218: Turn off equipment when not in use $1,114 - $1,114
16,706
kWh
- -
07 2.6232: Install set-back timers $410 $200 $410
6,155
kWh
- -
TOTAL RECOMMENDED $10,865 $9,642 $4,841
31,653
kWh
$6,074
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs