ITAC Assessment: WI0068
ITAC logo
ITAC Assessment: WI0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MECH.SPRINGS,WIRES FORMS
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,464 974,209
kWh
Natural Gas $23,699 6,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $5,126 $1,300 - $5,126
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,780 $5,000 $2,780
39,566
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $1,616 $7,000 - $1,616
-
MMBtu
-
04 2.8113: Purchase gas directly from a contract gas supplier $1,353 - - $1,353
-
MMBtu
-
05 2.4312: Improve lubrication practices $1,174 - $1,174
16,706
kWh
- -
06 2.3191: Use demand controller or load shedder $1,052 - $1,152
-
kWh
- $(-100.0)
07 2.4221: Install compressor air intakes in coolest locations $600 $1,000 $600
8,499
kWh
- -
TOTAL RECOMMENDED $13,701 $14,300 $5,706
64,771
kWh
$8,095
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $4,733 $6,000 $3,380
48,065
kWh
$1,353
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs