Assessment Year | 1989 |
---|---|
Principal Product | STAINLESS STEEL TANKS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,472 | 1,989,449 |
kWh
|
$0.055 |
Natural Gas | $35,885 | 7,057 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,364 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $12,224 | - | - |
$12,224
-
MMBtu
|
- | |
02 | 2.7261: Install timers and/or thermostats | $4,059 | $3,500 | - |
$4,059
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $709 | $2,290 |
$709
12,896
kWh
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,647 | - |
$4,327
-
kWh
|
- | $(-680.0) | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,596 | $6,000 | - |
$1,596
-
MMBtu
|
- | |
06 | 2.4312: Improve lubrication practices | $1,320 | - |
$1,320
24,326
kWh
|
- | - | |
07 | 2.7494: Install storm windows and doors | $959 | $2,090 | - |
$959
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $24,514 | $13,880 |
$6,356
37,222
kWh
|
$18,838
-
MMBtu
|
$(-680.0) | ||
TOTAL IMPLEMENTED | $6,364 | $11,790 |
$709
12,896
kWh
|
$5,655
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs