ITAC Assessment: UD0232
ITAC logo
ITAC Assessment: UD0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CUSTM. METAL FABRICATION
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $1
M
to 5
M
# of Employees 73
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,843 873,095
kWh
Natural Gas $29,144 5,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,451 - $1,451
-
kWh
- -
02 2.2511: Insulate bare equipment $3,368 $795 - $3,368
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $4,586 $10,000 $4,586
98,476
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,488 $1,700 $7,782
159,730
kWh
$(-786.0)
-
MMBtu
$492
05 2.7421: Reduce glazed areas in buildings $3,241 $8,860 - $3,241
-
MMBtu
-
TOTAL RECOMMENDED $20,134 $21,355 $13,819
258,206
kWh
$5,823
-
MMBtu
$492
TOTAL IMPLEMENTED $10,856 $2,495 $7,782
159,730
kWh
$2,582
-
MMBtu
$492
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs