| Assessment Year | 1987 |
|---|---|
| Principal Product | CUSTM. METAL FABRICATION |
| NAICS |
n/a
|
| SIC | 3449: Miscellaneous Structural Metal Work |
| Sales Range | $1 M to 5M |
| # of Employees | 73 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,200
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,843 | 873,095 |
kWh
|
$0.055 |
| Natural Gas | $29,144 | 5,917 |
MMBtu
|
$4.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,134 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,856 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,451 | - |
$1,451
-
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $3,368 | $795 | - |
$3,368
-
MMBtu
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $4,586 | $10,000 |
$4,586
98,476
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,488 | $1,700 |
$7,782
159,730
kWh
|
$(-786.0)
-
MMBtu
|
$492 | |
| 05 | 2.7421: Reduce glazed areas in buildings | $3,241 | $8,860 | - |
$3,241
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $20,134 | $21,355 |
$13,819
258,206
kWh
|
$5,823
-
MMBtu
|
$492 | ||
| TOTAL IMPLEMENTED | $10,856 | $2,495 |
$7,782
159,730
kWh
|
$2,582
-
MMBtu
|
$492 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs