ITAC Assessment: UC2302
ITAC logo
ITAC Assessment: UC2302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aerospace component manufacturing
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 19,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,656 476,229
kWh
Electricity Demand $22,494 1,870
kW-mo/yr
Electricity Fees $32,649 -
Natural Gas $2,354 139
MMBtu
TOTAL YEARLY COSTS $109,153
RECOMMENDED SAVINGS* $20,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8123: Pay utility bills on time $19 - - - $19 - -
02 2.8114: Change rate schedules or other changes in utility service $519 - - - $519 - -
03 2.8114: Change rate schedules or other changes in utility service $555 $540 - - $555 - -
04 2.8121: Apply for tax-free status for energy purchases $836 - - - $836 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,546 $3,714 $905
8,344
kWh
$602
-
kW-mo/yr
- $40 $(-1.2)
06 2.7135: Install occupancy sensors $136 $461 $74
685
kWh
$49
-
kW-mo/yr
- $7 $5
07 2.6231: Utilize controls to operate equipment only when needed $2,091 $431 $2,091
19,277
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $2,800 $1,203
11,089
kWh
$488
-
kW-mo/yr
- - -
09 2.4323: Use optimum size and capacity equipment $13,123 $2,864 $9,355
86,244
kWh
$3,768
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $20,515 $10,809 $13,628
125,639
kWh
$4,906
-
kW-mo/yr
$1,929 $47 $4
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs