ITAC Assessment: WI0048
ITAC logo
ITAC Assessment: WI0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 15,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,709 4,551,876
kWh
Natural Gas $576,262 138,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $144,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $6,089 - $6,089
131,594
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $2,151 $1,500 $2,151
46,600
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,825 $2,925 $1,825
39,273
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,313 $500 $2,129
46,014
kWh
$(-816.0)
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,152 $2,800 - $1,152
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $3,120 - - $3,120
-
MMBtu
07 2.8113: Purchase gas directly from a contract gas supplier $136,661 - - $136,661
-
MMBtu
TOTAL RECOMMENDED $152,311 $7,725 $12,194
263,481
kWh
$140,117
-
MMBtu
TOTAL IMPLEMENTED $144,575 $2,925 $7,914
170,867
kWh
$136,661
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs