ITAC Assessment: OK0941
ITAC logo
ITAC Assessment: OK0941
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Cash management systems
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3578: Calculating and Accounting Machines, Except Electronic Computers
Sales Range $50
M
to 100
M
# of Employees 145
Plant Area 75,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,272 777,100
kWh
Electricity Demand $21,175 2,562
kW-mo/yr
Natural Gas $4,022 545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $3,672 $11,835 $3,672
60,196
kWh
- -
02 2.6232: Install set-back timers $2,732 $245 $2,186
35,832
kWh
- $546
-
MMBtu
03 2.7211: Clean and maintain refrigerant condensers and towers $1,497 $1,960 $1,201
19,687
kWh
$296
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,762 $25,920 $5,104
83,678
kWh
$2,658
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $454 - $454
7,448
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $102 $350 $102
1,680
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $58 $336 $58
953
kWh
- -
TOTAL RECOMMENDED $16,277 $40,646 $12,777
209,474
kWh
$2,954
-
kW-mo/yr
$546
-
MMBtu
TOTAL IMPLEMENTED $9,259 $27,880 $6,305
103,365
kWh
$2,954
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs