Assessment Year | 2006 |
---|---|
Principal Product | Printed Paper |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
46,000
ft2
|
Annual Production | 2,335,600
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,274 | 1,813,280 |
kWh
|
$0.10 |
Natural Gas | $1,903 | 913 |
MMBtu
|
$2.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,578 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $6,000 | $12,340 | - | - | - | - |
$6,000
-
lb
|
|
02 | 3.5316: Contract a wood pallet recycling company | $4,963 | $250 | - | - | - | - |
$4,963
-
lb
|
|
03 | 3.4151: Minimize water usage | $245 | $1,800 | - | - | - |
$245
-
Tgal
|
- | |
04 | 2.7135: Install occupancy sensors | $1,702 | $570 |
$1,653
16,002
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,389 | $640 |
$1,371
13,275
kWh
|
$18
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $521 | $425 |
$516
4,993
kWh
|
$5
-
kW-mo/yr
|
- | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $408 | $230 |
$399
3,862
kWh
|
$9
-
kW-mo/yr
|
- | - | - | |
08 | 2.7134: Use photocell controls | $324 | $270 |
$315
3,047
kWh
|
$9
-
kW-mo/yr
|
- | - | - | |
09 | 2.4314: Use synthetic lubricant | $1,042 | $600 |
$1,024
9,912
kWh
|
$18
-
kW-mo/yr
|
- | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $955 | $600 |
$939
9,086
kWh
|
$16
-
kW-mo/yr
|
- | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $642 | - |
$631
6,113
kWh
|
$11
-
kW-mo/yr
|
- | - | - | |
12 | 2.2437: Recover waste heat from equipment | $378 | $950 | - | - |
$378
-
MMBtu
|
- | - | |
13 | 2.4133: Use most efficient type of electric motors | $1,935 | $1,200 |
$1,907
18,457
kWh
|
$28
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $20,504 | $19,875 |
$8,755
84,747
kWh
|
$163
-
kW-mo/yr
|
$378
-
MMBtu
|
$245
-
Tgal
|
$10,963
-
lb
|
||
TOTAL IMPLEMENTED | $4,578 | $1,905 |
$4,486
43,430
kWh
|
$92
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs