Assessment Year | 1999 |
---|---|
Principal Product | car and forklift batteries |
NAICS |
n/a
|
SIC | 3692: Primary Batteries, Dry and Wet |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
225,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,064,021 | 40,935,815 |
kWh
|
$0.026 |
Electricity Demand | $709,380 | 75,962 |
kW-mo/yr
|
$9.34 |
Electricity Fees | $17,911 | - |
|
- |
Natural Gas | $306,160 | 71,041 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,240,589 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,009,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $28,720 | $10,000 |
$22,343
859,613
kWh
|
$22,178
-
kW-mo/yr
|
$(-15,801.0)
-
MMBtu
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $4,539 | $1,500 | - | - |
$4,539
-
MMBtu
|
- | - | - | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $151,290 | $29,000 | - | - | - |
$91,290
-
gal
|
$60,000 | - | - | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $231,300 | $1,600,000 | - | - | - | - | - | - | $231,300 | |
05 | 4.113: Install refrigeration system to cool product | $824,740 | $836,000 | - | - | - | - | - | $(-20,000.0) | $844,740 | |
TOTAL RECOMMENDED | $1,240,589 | $2,476,500 |
$22,343
859,613
kWh
|
$22,178
-
kW-mo/yr
|
$(-11,262.0)
-
MMBtu
|
$91,290
-
gal
|
$60,000 | $(-20,000.0) | $1,076,040 | ||
TOTAL IMPLEMENTED | $1,009,289 | $876,500 |
$22,343
859,613
kWh
|
$22,178
-
kW-mo/yr
|
$(-11,262.0)
-
MMBtu
|
$91,290
-
gal
|
$60,000 | $(-20,000.0) | $844,740 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs