ITAC Assessment: AM0385
ITAC logo
ITAC Assessment: AM0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Softwood plywood
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 24,000
ft2
Annual Production 180,000
thousand feet
Production Hrs. Annual 8,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,237,338 36,672,000
kWh
Electricity Demand $488,585 74,028
kW-mo/yr
Natural Gas $98,999 27,304
MMBtu
Wood $484,000 1,411
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $423,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Wood Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 4.114: Add/modify equipment to improve drying process $303,000 - - - $(-28,000.0)
-
MMBtu
- - $331,000
02 2.2437: Recover waste heat from equipment $62,000 $5,000 - - $39,500
-
MMBtu
- $22,500 -
03 2.8114: Change rate schedules or other changes in utility service $36,500 - - $36,500 - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,500 $250 $8,500
197,600
kWh
- - - - -
05 2.2514: Cover open tanks $4,700 $6,335 - - $4,700
-
MMBtu
- - -
06 2.7124: Make a practice of turning off lights when not needed $4,500 $1,440 $4,500
105,300
kWh
- - - - -
07 3.7198: Reduce / eliminate use of disposable product $2,820 $699 - - - $2,820
-
lb
- -
08 2.2135: Repair and eliminate steam leaks $650 $250 - - $650
-
MMBtu
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $340 $140
3,300
kWh
- - - $320 -
TOTAL RECOMMENDED $423,130 $14,314 $13,140
306,200
kWh
$36,500 $16,850
-
MMBtu
$2,820
-
lb
$22,820 $331,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Wood Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs